Guardian Furnace Installation Manual

  суббота 12 января
      11
Guardian Furnace Installation Manual Rating: 5,0/5 7394 reviews

This Guardian furnace is an excellent addition to new construction and a substantial upgrade over older equipment, making it a great fit for nearly any comfort application. Guardian RGF-9-P Installation Manual. Guardian RGF-9-P Submittal. Guardian RGF Brochure. NG - 95.5% AFUE - Single-Stage - Multi-Position - Multi-Speed at eComfort. Create A Better Home Environment. Join the Guardian Technologies TM list for tips on healthy living, exclusive sale offers and new product announcements.

• Compact Design Big performance in a small 33-inch size is a perfect fit for any application. • Reliable Primary Heat Exchanger The aluminized tubular steel design provides maximum efficiency, superior corrosion resistance and long-term dependability. • Low Operating Sound Levels Quiet operation minimizes operating noise in your living space. • Durable Design Heavy-gauge, pre-painted galvanized sheet metal is folded and flattened for superior cabinet strength and also eliminates all sharp edges. • Advanced Controls The integrated control module ensures reliable and safe operation while increasing fuel efficiency.

• Offered in 40–130 BTU, 95.5% AFUE models (GG9S) • Offered in 40–130 BTU, 80% AFUE models (GG8S).

• Reading Gas Pressure.30 Furnace Control Board.31 Furnace Control Event Schedule. • • Furnaces installed near chemical storage areas • Chemical exposure The furnace requires OUTDOOR AIR for combustion when the furnace is located in an area where the furnace is being exposed to the follow- ing substances and / or chemicals. • Permanent wave solutions •. • The furnace area must not be used as a broom closet or for any other storage purposes, as a fire hazard may be created. Never store items such as the following on, near or in contact with the fur- nace.

• A gas-fired furnace for installation in a residential garage must be installed so the burner(s) and the ignition source are located not less than 18 inches (46 cm) above the floor, and the furnace must be located or protected to avoid physical damage by vehicles. • The furnace should be installed with coil cabinet part number specifi- cally intended for downflow application. If a matching cooling coil is used, it may be placed directly on the furnace outlet and sealed to pre- vent leakage. For details of the coil cabinet dimensions and installation requirements, refer to the installation instructions supplied with the coil cabinet. • These upflow coils are designed for installation on top of upflow fur- naces only.

If the coil is used with a furnace of a different size, use a 45° transition to allow proper air distribution through the coil. Position the coil casing over the furnace opening as shown in Fig- ure 6, 'PC Series Upflow Coil Installation'. • FIBERGLASS TAPE sides of the furnace and the building joists, studs or framing.

Actinver windows xp en mode sans echec cracker windows 7. This line UNDER FLANGE may be in contact with combustible material. Refer to Figure 10, 'Typi- cal Attic Installation'.

• All applications require the use of a field installed filter. All filters and mounting provision must be field supplied. Filters must be installed external to the furnace cabinet. DO NOT attempt to install filters inside the furnace.

NOTE: Single side return above 1800 CFM is approved as long as the filter velocity does not exceed filter manufacturer’s recommendation. • SIDE RETURN Locate the “L” shaped corner locators. These indicate the size of the cut- out to be made in the furnace side panel. Refer to Figure 13, 'Side Return Cutout Markings'. FIGURE 13: Side Return Cutout Markings Install the side filter rack following the instructions provided with that accessory. • PROPANE AND HIGH ALTITUDE CONVERSION KITS It is very important to choose the correct kit and/or gas orifices for the altitude and the type of gas for which the furnace is being installed.

Only use natural gas in furnaces designed for natural gas. Only use propane (LP) gas for furnaces that have been properly converted to use pro- pane (LP) gas. • Annual Fuel Utilization Efficiency (AFUE) numbers are determined in accordance with DOE Test procedures. Wire size and over current protection must comply with the National Electrical Code (NFPA-70-latest edition) and all local codes.

Goodman furnace installation manual

The furnace shall be installed so that the electrical components are protected from water. SUPPLY VOLTAGE CONNECTIONS. • For additional connection diagrams for all UPG equipment refer to “Low Voltage System Wiring” document available on-line at www.upgnet.com in the Product Catalog Section. AC 5D Single Stage Air Conditioner – Single Stage PSC Furnace THERMOSTAT *PP11C70224 Full Stage Compressor 24 –. • HP 2C Single Stage Heat Pump – Single Stage PSC Furnace THERMOSTAT THERMOSTAT *BP21H50124 *BN21H00124 *DN22U00124 *DP21H40124 *DN21H00124 FIGURE 19: Thermostat Chart - Single Stage HP with Single Stage PSC Furnaces Johnson Controls Unitary Products G*(8/9)S G*9F L(Y/M)8S THERMOSTAT SINGLE STAGE. • When two furnaces are installed using the same duct system, it is very important that the two furnace cir- culating air blowers operate in unison. If one blower starts before the.